Put the check in context
Water below a window may originate at the joint, glazing, drainage or a higher path; location alone does not identify a failed joint. The joint connects two surfaces. Appearance alone does not determine the product: adhesion, expected movement and water management need to be considered together before preparation is specified.
Completion points to examine
Compare documented areas and report recurrence under described conditions. Visually check joint continuity and intended drainage without stressing material that is still curing. Keep the work reference and report any difference from the agreed scope.
Compare the original observations
Record whether marks appear during rain and which areas become wet first. Show a close view of the joint and locate it on a full window photograph taken from an accessible position. Record whether one window or several similar units are affected. Compare the same areas while describing the conditions. Photographs taken under different lighting may not show identical appearance. Record concrete changes and the function the work was intended to restore.
Keep a record of the agreed work
Include dated photographs, circumstances and known previous repairs. Describe affected segments, visible materials and access constraints rather than simply counting windows. Match each photograph and reference to its window so similar units are not confused. Keep the accepted estimate, invoice and references supplied to you. Where work changed during the visit, have the scope change recorded so later follow-up remains understandable.
Report a result that needs follow-up
A visible joint does not prove the origin of a leak; preparation and application conditions need confirmation on the actual connection. Describe the location, conditions and behaviour observed. Share that information with the installer; avoid adding a product or adjustment that could alter the result before it is assessed.
Prepare for your request
- Compare documented areas and report recurrence under described conditions.
- Visually check joint continuity and intended drainage without stressing material that is still curing.
- Keep the work reference and report any difference from the agreed scope.
- Include dated photographs, circumstances and known previous repairs.
Common questions
Does a visual check prove all performance?
It records appearance or behaviour, but does not replace an appropriate technical check or measurement. A visible joint does not prove the origin of a leak; preparation and application conditions need confirmation on the actual connection.
Which records help with follow-up?
Keep the work documents and dated photographs of the affected areas. Compare documented areas and report recurrence under described conditions.